Electrical Substation

SCOPE

Electrical Substation Length: 37m Width: 5.3m Height: 3m

Completed:

2016

surface area:

25.8 tonne

location:

Nammuldi, Western Australia

The Nammuldi switchroom was constructed at our Perth site and transferred to the mining site in 2 engineered sections to be joined and commissioned on site.